The problem
Class wants a test procedure you can actually run and sign.
For ships contracted for construction on or after 1 July 2024, IACS UR E27, Cyber resilience of on-board systems and equipment (Rev.1, September 2023), is applied by IACS classification societies to computer-based systems in the scope of UR E26.
Suppliers are typically asked for a CBS asset inventory and topology diagrams, a description of security capabilities, a test procedure for those capabilities, security configuration guidelines and, after testing, signed test reports.
UR E27 expects the test procedure to have a separate chapter for each applicable requirement, covering test setup, equipment, initial conditions, detailed steps, expected results and acceptance criteria. Factory acceptance tests are then carried out against the agreed procedure and witnessed by class, unless the system already holds a relevant type approval.
Most small makers do not have a spare compliance team. Consultants and type-approval programmes are built for a different budget. Generic control kits help with paperwork, but they often stop short of a repeatable, requirement-by-requirement test method and a report a surveyor can sign.